|
INETEC News
10 January 2010
Performance Demonstration Initiative RPV at EPRI, USA
01 December 2009
Qualification of NDT Inspection for Loviisa NPP
23 October 2009
INETEC to perfrom ISI of Control Rod Protection Pipe Welds at Loviisa NPP, Finland
22 September 2009
Regional Workshop on Plant Life Management for Long Term Operation
24 August 2009
INETEC awarded Contract for ISI of Reactor Pressure Vessel at Loviisa NPP, Finland
|
News Content
01 December 2009
QUALIFICATION OF NDT INSPECTION FOR LOVIISA NPP
In-service inspection of reactor pressure vessel and control rod protection pipe welds in Loviisa 1 and 2 in 2010 and 2012 will be performed by previously qualified inspection equipment, NDT procedures and personnel as proposed by Finnish Regulation and Nuclear Safety Authority STUK. INETEC will perform the qualification of the inspection technique and examiners according to Finnish requirements and regulations which are based on the ENIQ recommendations.
|
 |